Contract Value:

£18.5 Million

The construction of the basement and podiums to Blocks A & B, including energy centre below block A. Superstructure to block A apartments comprising of 4 no. Blocks ranging from 11 to 16 floors. Construction of 3 storey in situ concrete substation Block D.

Scope of Works:

  • Existing site preparation.
  • Construction of access road, foul and surface water drainage
  • Road construction for Cambert Way into podium and basement and Tudway Road to basement to highway specification
  • Sheet piling attendance
  • Concrete foundation piling attendance to Plot B Temporary propping
  • Retaining wall construction